In readiness for the kitchen units being delivered today, I cleared a large space in the conservatory.
Temp kitchen, fridge, microwave, kettle, dishes and tea/coffee |
We'd converted the dining room into a temporary kitchen for the duration of the work and MWNN was worried that we would lose space to storing some of the boxes. However, all the main boxes are in the conservatory.
The only impact on the temporary kitchen is that we have lost a lot of light due to the stack outside the dining room window in the conservatory.
We pressed ahead with sealing the plasterwork (Friday) and began painting the top coat today.
Tomorrow (Sunday). we will add a second coat (diamond matt, primrose white) in those areas not covered by units.
The fitting begins on Monday morning, the beginning of week three without a working kitchen.