Thursday 17 September 2015

New kitchen - Day 16


Starting to re-use the kitchen and utility room.







First, clean the floor and remove the protective covering.
















Prime the dishwasher and run a pre-wash. There's a nifty device that projects how much time is left on a program, on the floor.












The utility has a new work-surface that takes up far less room than the selection of trolleys that used to support the microwave, bread maker, and slow cooker. There is enough room for the repairs necessary to make good the damage done by the leak in the shower room wall.

The drinks' chiller fridge is now housed in the larder.